As noticed from the figure beneath, ongoing auger is used to drill the borehole, carry up drilled soil, and pour concrete although the auger is moved up. As a result, the borehole won't need to have casing or hydrostatic strain to stop damage to the borehole wall.Join a hopper to the best of tremie pipe. After that, close the joint amongst hopper a